Custom Cabinet Supply from Guangdong
Your Cabinet Supply Partner in China

Custom Cabinet Supply from Guangdong.

For cabinet dealers, interior designers and contractors. Reviewed drawings. Verified materials. Every order 100% pre-assembled. Export-ready packing.

Guangdong
Factory Location
100%
Pre-Assembly Before Export
B2B
Dealer / Designer / Contractor Support
Human QC
Before Export Packing

Kitchen Cabinets

  • Base, wall, tall and island cabinets
  • Material and hardware directions
  • Lighting and special structures quoted separately
View Kitchen Cabinets

Wardrobes & Closets

  • Carcass, doors and internal drawers
  • Glass doors, lighting and accessories
  • Wall-panel integration options
View Wardrobes

Bathroom Vanities

  • Cabinet structure for moisture-area use
  • Finish, hardware and countertop coordination
  • Project-specific size review
View Vanities

TV & Living Cabinets

  • TV walls, display and living storage
  • Panel and cabinet coordination
  • Lighting and wiring allowances
View Living Cabinets

Door-Wall-Cabinet Systems

  • Integrated visual direction
  • Buildability and fixing review
  • Special structures reviewed by project
View Integrated Systems

Whole-Home Cabinetry

  • Room-by-room scope coordination
  • One material and hardware schedule
  • Factory coding, packing and handover
View Whole-Home Supply

Why Trade Teams Use COZI

Not just cabinets. A clearer backend for quote scope, materials, production, QC, packing and cross-border handover.

Scope Certainty

We clarify room list, cabinet type, material direction, hardware level, drawings and missing information before a reviewed quote is prepared.

Material Certainty

Panels, finishes, hardware and upgrade options can be shown with samples, labels, material sheets and documented selection records.

Production Certainty

Every cabinetry order is fully pre-assembled, aligned and checked in our Guangdong factory before export packing.

Market Certainty

Malaysia and Thailand can be discussed with installation support. Other markets are handled as supply-only or local-partner installation unless separately agreed.

Cabinet Construction & Material Direction

The final specification is confirmed by project. These are the decisions we organize before production.

Cabinet Structure

Project specifications define carcass, back panel, shelves, legs or plinth, and fixing method before production.

Edge & Finish Direction

Edge banding and finish direction are reviewed against the selected panel and visible-edge requirements.

Hardware Schedule

Soft-close hardware is scheduled by cabinet; functional storage and premium hardware remain selectable upgrades.

Lighting & Integration

Lighting, glass, wall panels and special structures are coordinated as project-specific options.

Five Clear Steps from Plans to Handover

01

Send Plans

Floor plans, room lists, site photos or hand-drawn measurements are accepted.

02

Initial Estimate

A planning reference before all details are locked.

03

Design & Material Lock

Confirm drawings, materials, hardware and responsibility scope.

04

Production & 100% Pre-Assembly

Every cabinetry order is pre-assembled, aligned and checked.

05

Packing, Delivery & Installation Support

Packing and service boundary follow the agreed market and project method.

Inside COZI Production + 100% Pre-Assembly

CNC cutting and production preparation
Factory pre-assembly check
Export packing preparation
CNC

Cutting, Drilling & Edge Processing

Production steps and cabinet labels create traceable parts for each room and cabinet.

100%

Full Factory Pre-Assembly

Every cabinetry order is fully pre-assembled, aligned and checked before export packing.

QC

Human Checks & Records

Door alignment, drawer operation, hardware, cabinet codes and packing handover are checked.

PACK

Export-Ready Packing

After verification, cabinets are packed assembled or disassembled according to the agreed method.

Choose the Starting Path That Matches Your Project

No franchise or long-term commitment is required for a first project. Start with one active cabinet scope and evaluate the working process.

Start with one active project. Review quotation clarity, material direction, production updates and delivery support before discussing repeat orders.

Cabinet Dealer / Showroom
Partner path · Repeat or pilot project

Send drawings, room lists and site information. COZI confirms scope, buildability, materials and the installation responsibility boundary.

Interior Designer / Contractor
Project path · Project-based cooperation

Projects with drawings or a local installation team can begin with a supply and landed-cost scope review.

Builder / Project Owner
Buyer path · Supply review

Start with the project information you already have.

Floor plans, room lists, site photos or hand-drawn measurements are accepted. Incomplete information is okay, and submitting a project does not commit you to an order.

WhatsAppGet Estimate