Inside COZI projects

See how projects move with COZI.

From early conversations and factory visits to trial assembly, packing and finished installation — a closer look at the work our team handles with overseas buyers.

COZI factory pre-assembly floor with cabinet modules prepared for checking
Made in Guangdong
Factory production
Trial assembly
Fit checked before export
Project updates
Kept with each stage
From project conversations

The moments clients chose to share.

Short excerpts from project conversations, shown alongside the market, project type and stage they came from.

Original client conversation screenshot 1
Original client conversation screenshot 2

Project conversation · personal details hidden where needed

Project conversation
asdadas
asdasd
asdasd
iasd13123
Source: asdasdas Feb 2022
Inside the factory

How an order moves through the floor.

Machining, coding, trial assembly and packing are part of the normal flow before an order leaves Guangdong.

COZI factory CNC cutting and cabinet component production line
01 · MachiningHow are the parts made?

CNC cutting and drilling

Cabinet components move through visible machining before sorting and assembly.

Cabinet components with production coding labels
02 · TraceabilityHow are parts kept together?

Part coding and sorting

Labels and grouped components help trace parts by cabinet, room and project.

Cabinet modules arranged for full factory pre-assembly checks
03 · Pre-assemblyWhat is checked before packing?

Full factory trial assembly

Cabinet modules are set out for alignment, fit and hardware checks before export packing.

Protected cabinet components staged for export packing
04 · HandoverHow is the order prepared to leave?

Export packing preparation

Checked components are protected and staged for the agreed shipment method.

Planning a similar cabinet project?

Tell us your market, cabinet scope and buyer role. We can talk through the approach and share a relevant project reference when it is useful.

WhatsAppGet Estimate