Common design handoff risks
Missing production details
Material substitutions without approval
Unclear revision and design-lock stages
Installation information lost between teams
Design and specification support
Keep the design intent while converting room lists, finishes and drawings into a clearer cabinet supply scope.
Best suited for: Interior designers and design-build firms that need a production partner after concept development.
Missing production details
Material substitutions without approval
Unclear revision and design-lock stages
Installation information lost between teams
Drawing and room-list review
Material and finish confirmation
Design-lock and revision records
Production and pre-assembly checks
Floor plan and elevations
Room and cabinet schedule
Material palette
Target market and installation party
Service boundary
COZI reviews manufacturability and supply scope. The appointed local designer and installer remain responsible for site measurements, local codes and installation unless separately contracted.
Incomplete plans can still be submitted. COZI will mark missing information for manual review before a reviewed quotation.